Plan Your Work and Work Your Plan

Project Planning

Good requirements simplify the process for project planning. With a clear understanding of the requirements, you can then break the work down into the elemental tasks required to meet the system requirements – and only the system requirements. Perhaps, just as importantly, you can define the necessary testing to validate that the system meets the requirements.

The V-modelV-Model

Defined in the 1980s, the V-Model has been used heavily in the automotive industry, was designed to simplify the complexity associated with developing systems. Today is commonly used in control design and software development. It summarized the main steps corresponding to deliverables in a system validation framework. The left side represents the decomposition of requirements and the creation of system specifications. The right side represents the integration of the parts and their verification according to the design and system requirements. Although the names of the individual steps may differ from one context to the next, the fundamental principle of correspondence applies. For instance:

  1. User Specifications – can correspond to the requirements that must be validated during the Site Acceptance Test (SAT).
  2. Functional Specifications – can correspond to the requirements that must be validated during the Factory Acceptance Test (FAT).

Work Breakdown Process

Ultimately, the work breakdown process results in the individual ‘work packages’ to develop the system. For each work package, you should be able to define:

  1. Definition of work – what is to be implemented
  2. What’s needed – equipment, knowledge, prior work (on the project)
  3. Time/cost – the estimated time and cost to complete the work package
  4. Deliverable – what must be produced to complete the task

Check out other blogs about the V-Model. 

Advertisements

8 Responses to Plan Your Work and Work Your Plan

  1. Jefferson says:

    Growing up my father always used the following phrase, “Plan your work, and work your plan. He was a firm believer that if you had a plan to follow you would always wind up on top. That’s what you also mean here.

  2. […] Barber In previous posts, we have talked about the importance of good project scheduling. Once the work breakdown is completed, you can construct a project schedule to complete the specified tasks and eventually the project. […]

  3. […] – Start With a Good Design By Jack Barber Once you’ve taken adequate time to plan and schedule your project, now comes the easy part – the actual project work. But, you may not […]

  4. […] to ensure that the work is as consistent and efficient – and conducted according to your project plan. Each development task (sometimes referred to as a work package) should have defined milestones, […]

  5. […] A few housekeeping items before starting a project. […]

  6. […] sure that you perform a thorough Factory Acceptance Test (FAT) as defined by your V-diagram process to validate that your system meets all of the specified requirements. Involve the customer if […]

  7. Marvelous, what a blog it is! This weblog gives valuable information to us,
    keep it up.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: